Better buildings do not have to cost more.

Better buildings do not have to cost more.

Better buildings do not have to cost more.

Mechanical and electrical engineering, feasibility and low carbon strategy for developers who need the numbers to work before the drawings do. We balance capital cost, operating cost and carbon in the same conversation, because on a real project they were never separate.

Mechanical and electrical engineering, feasibility and low carbon strategy for developers who need the numbers to work before the drawings do. We balance capital cost, operating cost and carbon in the same conversation, because on a real project they were never separate.

Evolv1 · Waterloo, ON

104,000 sf · Complete 2018

01 · What we do

Four services, one model of the building.

Four services, one model of the building.

Four services, one model of the building.

01

Mechanical and electrical design

Mechanical and electrical design

Mechanical and system design for residential, commercial, institutional and laboratory buildings. Stamped, coordinated, buildable, and taken through construction.

02

Strategic feasibility & systems optimisation

Strategic feasibility & systems optimisation

Early stage modelling that tells you what a target costs before it is committed to a pro forma. At community scale this extends to master planning and shared energy infrastructure.

03

Carbon & sustainability strategy

Carbon & sustainability strategy

Net zero and zero carbon pathways that survive value engineering, including certification frameworks, with operational carbon measured rather than assumed.

04

Prefabrication & procurement

Prefabrication & procurement

Where repetition exists we take it off site. This is the work that became R6 Systems.

03 · How we work

We challenge the idea that a better building is a more expensive one.

We challenge the idea that a better building is a more expensive one.

We challenge the idea that a better building is a more expensive one.

Engineering first, not last

We join early enough to change the outcome. Brought in after the massing is fixed, all we can do is document someone else’s decisions.

One model, three currencies

Capital cost, operating cost and carbon in the same model, so a trade-off is a decision rather than a surprise.

Procurement is design

What can be bought, when, and from whom shapes the drawings. We plan it rather than inherit it.

Validated, not asserted

Performance claims go through third-party engineering validation, and where a building is occupied we measure it afterwards. If we cannot prove it we do not put it in a deck.

04 · Team

Kenny Smith

Co-founder · Innovation & Engineering

Engineer with twenty years in buildings, M.Eng, P.Eng in Ontario, C.Eng and MCIBSE in the UK, LEED AP. Leads all technical development.

Mark Alo

Co-founder · Product & Technology

A decade in building development and a decade in technology and product. Leads product, commercialisation and partnerships.

Start a project

Tell us what you are building and what the target is.

Tell us what you are building and what the target is.

Tell us what you are building and what the target is.

Feasibility, a full MEP package, or a second opinion on a target you have already committed to. Send the constraints and we will tell you what is achievable.

Feasibility, a full MEP package, or a second opinion on a target you have already committed to. Send the constraints and we will tell you what is achievable.

Integrated building systems engineering, prefabrication and urban agriculture. Toronto, Ontario.

Get in touch

111 Peter St, Suite 700

Toronto, ON M5V 2H1

© 2026 Firm Six