Mechanical · Laboratory
Complete 2023

CNL Chalk River Laboratories · 500,000 sf across three buildings
Location
Chalk River, ON
Area
500,000 sf across three buildings
Sector
Mechanical · Industrial
Scope
Sustainable design, mechanical and energy engineering
Architect
HDR
Delivery
Integrated project delivery
Year
2023
Client
Canadian Nuclear Laboratories
01 · The project
Brief
Sustainable design, mechanical and energy engineering across three buildings at Chalk River: a support facility for maintenance and manufacturing, the Minwamon public welcome building, and a six storey science collaboration centre. All three are mass timber, all three were delivered through an integrated project delivery process.
Challenge
Integrating cost effective and constructable low embodied and operational carbon strategies across a range of building typologies. Justifying and modelling real impact through the design process, construction and building lifespan.
Outcome
Delivered and complete in 2023, all three buildings under one coordinated mechanical strategy.
02 · Gallery

Science collaboration centre

Campus context

Main entrance

Reception

Circulation and collaboration space

Support facility, maintenance and manufacturing

Fit out under way

Services coordinated against the timber structure
Images: HDR and Kevin Belanger
Similar problem?
Send the constraints, we will tell you what is achievable.
Integrated building systems engineering, prefabrication and urban agriculture. Toronto, Ontario.
Get in touch
Firm Six & R6 Systems
111 Peter St, Suite 700
Toronto, ON M5V 2H1